The website continues to be filled in with new text – Once again our host lost both our website and the backups. Nothing complicated about the website and it was time to rewrite some things – but it is taking a bit of time.
The end of cold weather and the firming of the ground brings a lot of outdoor work. Clearing brush, removing stumps, preparing to cut grass.
The removal of stumps has made me have to reroute some water lines and the pool will be up and running in the next week.
In addition to outdoor stuff, finishing off some new lighting indoors and pouring concrete for the final three pens to be “Renovated”
Upcoming weekends (as of April 17)
April 21 Weekend we have minimal space remaining.
April 28 Weekend we are about 60% full.
May long weekend (May 19-22) we are about half full. There is at the moment a two night minimum required.